Bamboo Fabric Customized Color Production Time

Our dyeing line has four machine capacity tiers - 25 kg, 150 kg, 300-500 kg and 1000 kg per color. Ordering 300 kg per color instead of 150 kg noticeably shortens lead time in busy seasons.
Four Capacity Tiers on Our Dyeing Line
Our color dyeing production line has four kinds of capacity level machines. Most factories operate with a similar machine mix.
| Tier | Capacity per Color | Share of Our Machines | Typical Use |
|---|---|---|---|
| Sample | 25 kg | About 5% | Sample color production - always busy |
| Medium | 150 kg | About 30% | Small and medium orders - frequently queued |
| Large | 300 - 500 kg | About 50% | Standard bulk orders - faster throughput |
| Extra large | 1000 kg | About 15% | Large program orders |
Why 150 kg Orders Queue Longer
The 150 kg machines are always very busy. Every client has small orders, so in busy season these machines build a waiting line and your production waits with them.
The Practical Recommendation
If you are dyeing 300 kg per color, the large capacity machines make production noticeably faster, especially in busy season. So for regular fabrics and colors you use repeatedly, please consider consolidating to 300 kg per color where your program allows it.
Consolidating gives you three benefits: faster production on our side, a stock position on your side so you are not waiting on every reorder, and fewer repeated small-lot dyeings, which also improves color consistency between deliveries.
Planning Tips
- Confirm colors against a lab dip before booking bulk dyeing
- Group styles that share a color into one dye lot
- Tell us your annual volume so we can reserve capacity ahead of peak season